The Best Practice Test Preparation for the E-S4HCON2023 Certification Exam [Q27-Q48]

Share

The Best Practice Test Preparation for the E-S4HCON2023 Certification Exam

E-S4HCON2023 Exam Dumps, Practice Test Questions BUNDLE PACK

NEW QUESTION # 27
Which preparational steps must be performed for an SAP S/4HANA conversion?
There are 2 correct answers to this question.
Response:

  • A. Install add-on SAP Gateway 7.50
  • B. Uninstall Fiori apps not released for SAP_UI 7.50
  • C. Delete client 066 (Early Watch Client)
  • D. Uninstall industry extensions not supported by SAP S/4HANA

Answer: B,C


NEW QUESTION # 28
You are planning an SAP S/4HANA conversion. Which conversion-specific tasks need to be performed during the preparation phase?
There are 2 correct answers to this question.
Response:

  • A. Run the database migration to the SAP HANA database
  • B. Check the compatibility of custom code with SAP S/4HANA
  • C. Perform the migration of data into the new data structure
  • D. Apply the recommendations of the simplification list

Answer: B,D


NEW QUESTION # 29
During a SUM run you want to check if the phase SHADOW_IMPORT_INC is still running properly. Where can you find information about this?
There are 2 correct answers to this question.
Response:

  • A. Check for running R31oad processes on the host of the primary application server
  • B. Check for running R3trans processes on the host of the primary application server
  • C. Check for running batch jobs in the shadow system via Job Overview (SM37)
  • D. Check for the latest log files in the SUM directory, subdirectory ABAP, subdirectory tmp

Answer: B,D


NEW QUESTION # 30
You are performing an upgrade with SUM using DMO to an AS ABAP 7.50 based SAP system. You entered a specific number of R3Ioad processes during Roadmap step "Extraction".
Where can you change this during the migration via the Utilities option of the SUM UI?
There are 2 correct answers to this question
Response:

  • A. In DMO Migration Preparation
  • B. In Process Control Center
  • C. In SUM Parameters
  • D. In SUM Phaselist

Answer: B,C


NEW QUESTION # 31
You are using the maintenance planner to calculate the required software components for your SAP S4HANA conversion. What do you need to know regarding SUM?

  • A. As soon as the next SP level of SUM is available, the current version of SUM passes into "patch on request mode" immediately.
  • B. AA

Answer: A


NEW QUESTION # 32
During the SUM procedure, the phase XPRAS_AIMMRG fails. Where can you most likely see the reason for the error?
There are 2 correct answers to this question.
Response:

  • A. In the latest log files in the SUM directory, subdirectory ABAP, subdirectory log
  • B. In the latest log files in the SUM directory, subdirectory ABAP, subdirectory tmp
  • C. In the corresponding R3trans log files of this phase
  • D. In the job log for the corresponding job in SM37 (Job Overview)

Answer: A,D


NEW QUESTION # 33
You want to perform custom code check via ABAP test cockpit in preparation of your SAP S/4HANA conversion? What kind of SAP System can you use to generate the custom code migration worklist?

  • A. A Standalone SAP system with ABAP 7.51 or above
  • B. An SAP S4HANA 1709 sandbox system
  • C. AA

Answer: A,B


NEW QUESTION # 34
Which circumstances will allow SUM to run without the creation of a shadow system?
Please choose the correct answer.
Response:

  • A. Using the main configuration option "Single System" when installing an Add-On
  • B. Using the main configuration option "Standard" when applying SAP Support Packages
  • C. Using the database migration option (DMO) for SUM
  • D. Using the main configuration option "Single System" in case of an upgrade.

Answer: A


NEW QUESTION # 35
How does SUM recognize modification adjustment transports from predecessor systems?
Please choose the correct answer.
Response:

  • A. By searching for transport requests in the file umodauto.Ist
  • B. By searching for transport requests named <SID>K0<number>
  • C. By searching for transport requests in DIR_TRANS, subdirectory "transport"
  • D. By searching for transport requests that are assigned to the project SAP_ADJUST

Answer: A


NEW QUESTION # 36
You are performing an SAP S/4HANA conversion. Which phases are executed during SUM technical downtime? Note: There are 2 correct answers to this question

  • A. TABIMJJPG
  • B. TABIM_SHADOW_*
  • C. PARMVNT_UPG
  • D. PARDIST_SHD

Answer: A


NEW QUESTION # 37
SUM was registered at the SAP Host Agent. Based on which information does the SAP Host Agent determine the path to the SUM directory.

  • A. The path was stored to the environment of user <sid>adm during registration
  • B. The path was stored in file sumabap conf during registration
  • C. The path was stored in file host_profile during registration
  • D. The path is taken from the URL entered in the browser to start SUM

Answer: B


NEW QUESTION # 38
In ICNV. How database operations synchronized between the source and the target table?

  • A. Deletes are directly executed in the target table by delete trigger.
  • B. AA

Answer: A


NEW QUESTION # 39
When using the DMO of SUM, which files can be handled by SUM in the download directory?
There are 2 correct answers to this question.
Response:

  • A. Breakpoint configuration file SAPUPPHAS.BRK
  • B. Parameter file SAPup_add.par
  • C. Stack XML file calculated by the Maintenance Planner
  • D. MIGRATE J5T_DUR_XML file from a previous run

Answer: C,D


NEW QUESTION # 40
You are planning to use DMO of SUM to perform an "inplace-migration" to SAP HANA. What do you need to consider? Note: there are 2 correct answers to this question.

  • A. Network capacity between exporting and importing R3load processes must be.
  • B. SAP HANA Landscape Reorganization required a manual step to edit a file.
  • C. The target database size increases temporarily because of the Shadow Repository.
  • D. Unicode conversion is part of DMO only in case of target version AS ABAP 7.40 or 7.31.
  • E. The source system is non-Unicode and the target database is a scale-out system.

Answer: B,D


NEW QUESTION # 41
You are planning to upgrade your SAP ECC 6.07 system running on a single codepage (SCP) to SAP ECC
6.08. What is the recommended option to perform this upgrade?
Please choose the correct answer.
Response:

  • A. Perform the upgrade to SAP ECC 6.08 before the Unicode conversion.
  • B. Perform the Unicode conversion before the upgrade to SAP ECC 6.08.
  • C. Combine the upgrade and the Unicode conversion using the Twin Upgrade &Unicode Conversion (TU
    &UC) procedure.
  • D. Combine the upgrade and the Unicode conversion using the Combined Upgrade &Unicode Conversion (CU &UC) procedure.

Answer: B


NEW QUESTION # 42
What SAP systems can you use for the ABAP Test Cockpit (ATC) to perform the custom code analysis for an SAP S/4HANA conversion? Note: There are 2 correct answers to this question.

  • A. SAP Solution Manager 7.2
  • B. SAP S/4HANA Server 1809 and above
  • C. SAP ECC system from SAP ERP 6.0 EHP 8
  • D. Standalone AS ABAP with SAP_BASIS 752 and above

Answer: B,D


NEW QUESTION # 43
What do you need to consider when performing the SI checks for an SAP S'4I 1ANA conversion? Note There are 2 correct answers to this question.

  • A. The errors from the SI checks must be solved, otherwise. SUM will report an error
  • B. You need to build up an SI check framework by applying SAP Notes
  • C. You need an SAP system based on AS ABAP 7.50 or above for the SI check framework
  • D. The SI checks are executed in the development system and the results are transported into the subsequent systems

Answer: B,C


NEW QUESTION # 44
You are performing an SAP S/4HANA conversion. When does the silent data migration (SDM) take place?

  • A. During the Execution roadmap step
  • B. Before the start of the SUM technical downtime
  • C. After SUM has ended
  • D. During the SUM technical downtime

Answer: D


NEW QUESTION # 45
You want to perform an SAP S/4HANA conversion using SUM with DMO. Which steps run before the beginning of the technical downtime, independent of your SUM configuration?
There are 3 correct answers to this question.
Response:

  • A. Import of upgrade and language data from the download directory in phase TABIM UPG
  • B. Creation of application tables in the SAP HANA database in phase EU_CLONE_MIG_DT_CREATE
  • C. Generation of the new ABAP loads in phase RUN_SGEN_GENER8
  • D. Import of dictionary objects from the download directory in phase DDIC_UPG
  • E. Activation of dictionary objects in phase ACT_UPG

Answer: A,D,E


NEW QUESTION # 46
You are starting an SAP S/4HANA Conversion. The scenario strategy Downtime Optimized Conversion (DoC) is NOT selectable.What could be the reason?

  • A. The SAP S/4HANA Conversion includes a DMO.
  • B. The source database is not supported
  • C. The SAP S/4HANA Conversion is without DMO.
  • D. The start release is too old for DOC.

Answer: B


NEW QUESTION # 47
You are performing an inplace SAP S/4HANA conversion including DMO. What is the latest point in time when you can reset the procedure without losing data?

  • A. The start of the Execution roadmap step
  • B. The end of the business downtime
  • C. The start of the business downtime
  • D. The end of the database migration

Answer: B


NEW QUESTION # 48
......

Prepare for the Actual SAP Certified Technology Specialist E-S4HCON2023 Exam Practice Materials Collection: https://certkingdom.pass4surequiz.com/E-S4HCON2023-exam-quiz.html